Continuous fryer machine for sale to Cameroon

continuous fryer machine

In May 2022 we exported to Cameroon a continuous fryer machine, which makes our first cooperation, but through this cooperation, we have a good relationship and are ready to establish a long-term relationship and are negotiating about the packaging machine products. Here are the details of the cooperation between Taizy company and the customer in Cameroon.

Details of a deal with a customer for the fryer in Cameroon

We received an inquiry from a customer in Cameroon about the fryer and immediately arranged for our manager to send him the details of the machine. The customer in Cameroon is a company that produces banana chips and needs a continuous fryer with high efficiency, and the customer has a freight forwarder, which means we only need to ship the fryer to Guangzhou.

Introduction of the continuous fryer

Frying machine
Frying Machine

A continuous fryer is continuous frying equipment, fryer heating methods are various, can be electric heating or gas heating, in production need to preheat 20 minutes in advance, then you can fry, and then within 1-2 hours, the fryer will be in a stable state, which is continuous fryer frying gas consumption will be significantly reduced. It is a very energy-saving machine. This fryer has two tanks, one oil tank, and another vacuum oil filter.

Parameters of the continuous fryer machine

1. Frying section

Frying section
Frying Section

Model: TZ-2500

Burner power: 100,000kcal

Voltage:220V 50hz 1phase

Dimension:2500*1500*1600mm

weight:1000kg

Mesh belt width: 400mm

Machine material: SUS 304

Heating type: LPG gas

Burner brand: Italy brand RIELLO

The price includes a wooden package

2. Cooling section

Model: TZ-3000

Size: 3000*1200*1600mm

Weight: 400kg Power: 7.5kw

Voltage: 380v, 50hz, 3 phase

Machine material: SUS 304 Fan number: 3 pcs

Continuous fryer machine customer requirements

1. The length of the frying line is 3m

2. The heating method of the fryer is natural gas

3. Need cooling table

4. Delivery time is within 15 days to Guangzhou.

Share to:
Facebook
Twitter
LinkedIn
Pinterest
Reddit
Tumblr
WhatsApp
Skype
Email

Leave a Reply

Your email address will not be published. Required fields are marked *